Good to see you!
Welcome to Dulux
Terms & Conditions
Registration complete
Successfully registered, please login
Registration complete
Forgotten your password?
Please enter email address associated to your account
Change Password
Password changed successfully.
Request sent!
If you have concerns about your privacy?
Read our Privacy Policy.
Delete Account
DULUX TRADE UNDERCOAT
-
Drying Time 2-6 Hours. Drying time depends on weather conditions (humidity, temperature)
-
Coats 1
-
Excellent Levelling Properties
-
High Opacity
Product Description
Application Description
Health & Safety
Tips & Advice
-
1. Preparing the SurfacesTo get the best results, ensure surfaces to be painted are sound, clean and dry (new surfaces particularly must be fully dry) and free from all defective or poorly adhering material such as dirt, grease and wax.
New or bare surfaces should be primed with an appropriate Dulux Trade primer.
Thoroughly rub down previously painted surfaces, using ‘wet flatting’ methods where possible, then wipe off with a damp, lint free cloth. -
2. After useDo not empty or flush leftover paint from containers and tools or its residues down the sink, toilet, drain or waste bin.
-
3. StoringStore between 5oC to 40oC.
How much paint do I need?
Measure the height and length of the surface you want to paint (in metres or centimetres).
Your Measurements:
{{!-- This value will be injected with JavaScript --}}
Amount needed:
{{!-- This value will be injected with JavaScript --}}
Actual coverage will depend on the conditions of the surface. If the colour change is strong, more coats may be required.
Add a new job
Add a new job
Edit a job
Delete job
Are you sure? All notes, photos and saved items will be deleted.
Save colour
Save to My Workspace
Save product
DULUX TRADE UNDERCOAT
Save job